Create a project

Start a new project in a few minutes. A template gives you the phases, tasks, milestones, links between tasks and starter risks of a proven plan, with dates already worked out from your start date. You can also start from a blank project, copy an existing one or import tasks from a spreadsheet.

Before you start

  • Choose Project Management in the category switcher at the top of the screen.
  • You need permission to create projects. If you don't see New from template or Blank project, ask your administrator.
  • Decide on a short project code, for example NETST. It starts every task number in the project (NETST-12).
  • Time needed: about 5 minutes.

The project list

Open Projects → Projects in the menu. Every project you can see is listed with its status, priority, health, progress, owner and dates.

The project list with five example projects

The project list of the example company, Nexa IT Services.

The buttons at the top of the project list

1 New from template, 2 Blank project, 3 the Current / Archived / Recently deleted switch and 4 the search box.
Column What it means
Code and Name Click either one to open the project.
Status Draft, Planning, Active, On hold, Completed or Cancelled.
Priority Low, Medium, High or Critical.
Health On track, At risk or Off track, worked out by the ERP from overdue work, open risks and issues, and people's workload.
Progress The share of the project's items that are done. Point at the bar to see, for example, "10 of 25 items done · 4 overdue".
Owner and Dates The person responsible for the project, and its start and end dates.

Use the switch at the top to see Current projects, Archived projects (finished projects kept read-only) or Recently deleted projects. Type part of a name or a code in Search name or code and press Enter to find a project.

Create a project from a template

The New project from a template window has four steps: Template → Basics → People → Preview. Nothing is created until you click Create project on the last step.

  1. Click “New from template” at the top right of the project list.

  2. Choose a template. Use the row of categories (All, IT services, Construction, Software and so on) to narrow the list, then click a template card. Each card shows the method (waterfall, scrum, kanban or hybrid), the number of items and milestones, the typical length in working days and the number of starter risks.

    Step 1: the Software templates
    The Software category has a Kanban and a Scrum template.

    Templates marked “Awaiting expert review”

    Some industry templates (for example construction, healthcare or audit) carry an orange Awaiting expert review tag. Their content has not yet been checked by an expert in that field, so you can preview them but not create a project from them. An administrator can click Copy to my templates on the preview step, check the copy with your own experts and publish it. See Project templates.

  3. Fill in the basics and click Next.

    Field What to enter Example
    Project code (required) 2 to 10 capital letters or digits, starting with a letter. It is used in every item key. SBKYC
    Project name (required) A name people will recognise. Video KYC Module – Sahyadri Bank
    Start date (required) The first working day of the project. All dates are calculated from it, skipping weekends and holidays. 25 Nov 2026
    Visible to Whole organisation, Team members or Private. Leave it empty to use the template's default. Whole organisation
    Template options Questions that shape the plan, such as the number of sprints or whether to include a hardening phase. 3 sprints, hardening on

    Step 2: code, name, start date and the template options
    The Basics step for a Scrum project with three sprints.

  4. Choose a person for each role and click Preview. The template's roles (for example Product owner, Scrum master, Developer, QA engineer) get the tasks that belong to them. The people you choose join the project team. Tasks for a role you leave as Nobody yet stay unassigned. You become the project manager.

    Step 3: a person chosen for each role
    Rahul Verma is the product owner and Kavya Reddy the QA engineer.

  5. Check the preview. The preview shows the start, the Planned finish, the number of working days and the contents (phases, items, milestones and links). Below are the Outline with dates, the Critical path (the chain of tasks that decides the finish date) and the Starter risks that will be added to the risk register. A yellow box lists anything to check, such as a role with nobody assigned. Holidays the schedule skipped are listed too.

    Step 4: the preview with the outline and the critical path
    The plan finishes on 22 Jan 2027; 25 Dec was skipped as a holiday.

  6. Click “Create project”. Turn on Tell the team (one message each) first if you want each team member to get one notification. The project opens.

What happens next

The project has its phases, tasks, milestones and dependencies, with dates and assignees. The template's checklists, acceptance criteria and starter risks are in place. Open the project's Gantt tab to see the plan as a chart.

Create a blank project

Use a blank project when no template fits.

  1. Click Blank project at the top right of the project list.
  2. Fill in the New project window and click OK.

    Field What to enter Example
    Code (required) 2 to 10 capital letters or digits, used in task keys like ERP-12. SHOWRM
    Name (required) The project name. Showroom Wi-Fi – Sharma Textiles
    Status Draft, Planning (the default) or Active. Planning
    Priority Low, Medium, High or Critical. Medium
    Description What the project delivers. New access points for the Pune showroom
    Start / end The planned dates. 1 Dec 2026 → 15 Dec 2026

    The New project window
    A blank project needs only a code and a name.

  3. The project opens on its Tasks tab. Add tasks with New task, or import them (below).

Import tasks from a spreadsheet

You can load many tasks at once from a CSV file (a spreadsheet saved as "comma-separated values").

  1. Open the project and click the Tasks tab, then Import CSV.

    The Import work items window
    The Import work items window lists the columns it understands.

  2. Click Download template to get a sample file with the right column headings. Only title is required. The other columns are ref, parentRef, description, type, priority, assigneeEmail, startDate, dueDate, estimateHours, tags and acceptanceCriteria, plus one cf.<key> column for each of the project's custom fields.

    • To make subtasks, give the parent row a ref (for example e1) and put the same value in the child's parentRef. List parents before their children.
    • Separate several tags or acceptance criteria with a semicolon (;).
  3. Fill in the file in your spreadsheet program, save it as CSV, then click Choose CSV file.
  4. The ERP checks every row. Rows with problems are shown in red with the reason. Fix the file and choose it again.
  5. When every row is OK, click Import N items. Nothing is created until all rows are valid, and nobody is notified.

You can also add a ready-made set of tasks, such as a release checklist, with Add from item set. See Item sets.

Copy an existing project

When a new job is like an old one, copy the old project.

  1. Open the project you want to copy and click Duplicate at the top.
  2. Enter a new Code, a Name (it starts as “Copy of …”) and the Start date. All dates move to the new start.
  3. Tick or clear Keep the same people on items, Copy the team and their project roles and Copy deliverables.
  4. Click Create copy.

    The Duplicate window
    The copy takes the item tree, estimates, dependencies, milestones, types, checklists and acceptance criteria.

Logged time, comments and files are not copied.

Save a project as a template

If a project went well, turn it into a template for next time. You need permission to manage templates.

  1. Open the project and click the ⋮ (Project actions) button at the top.
  2. Click Save as template…, check the template name and click Save draft.
  3. The ERP opens Configuration → Project templates, where the new template waits as a draft. Review it and publish it there; see Project templates.

The template keeps phases, items, checklists, acceptance criteria, milestones and links. People become roles, and dates become offsets from the start. Time, comments and files are not copied.

Archive, delete and restore a project

These actions are in the ⋮ (Project actions) menu at the top of a project, and need administrator rights for projects.

The project actions menu

The Project actions menu: archive, save as template and delete.
  • Archive (read-only): the project moves to the Archived list and nobody can change it. Open it from Archived and choose Unarchive to make it editable again.
  • Delete project…: after you confirm, the project and all its tasks are hidden from everyone. To bring it back, open Projects, switch to Recently deleted and click Restore next to the project.

Close a finished project instead

When the work is done, use Close project at the top of the project rather than archiving or deleting it. The ERP checks that nothing is left open first. See The project workspace.

Common questions

Can I change the project code later?

No. The code is part of every task number, so it is fixed when the project is created. You can change the name at any time with Edit project.

Why is “Create project” greyed out on the preview?

The template is marked Awaiting expert review. Ask an administrator to copy it to your templates, check it and publish the copy, then use the copy.

The template's dates fall on a holiday. What happens?

The schedule skips weekends and the holidays in the project calendar; the preview lists the holidays it skipped. You can change the working days and holidays later on the project's Schedule tab.

I created the project with the wrong start date.

Open the Gantt tab and drag the bars, or change the dates on the Schedule tab. If you have just created it, it is often quicker to delete it and create it again.